Key terms for this module
Read these first. Every one of them comes up in the sections below.
| Operating volume | All the water in a running system: display, sump and reactors, minus rock and sand. |
| Running level | The water level in the sump with the pumps on. |
| Displacement | The volume of water pushed out by rock, sand and equipment. |
| Liter (L) | The metric unit of volume; 1000 milliliters (mL). |
| US gallon | A US unit of volume: 231 cubic inches, or 3.785 L. |
| ppt | Parts per thousand; used for salinity. |
| ppm | Parts per million; in water, about 1 mg/L. |
| dKH | Degrees of carbonate hardness, a unit of alkalinity. |
| meq/L | Milliequivalents per liter, a unit of alkalinity; about 2.8 dKH. |
| Concentration | How much of something is in a given volume of water. |
| Dilution | Spreading the same amount of something through more water. |
| Shortfall | How much a level falls each day on the current dose. |
| Reference volume | The volume a label's dose is given for, such as 100 L. |
| Head | The resistance a pump pushes against: lift, elbows and pipe. |
| Pump curve | The maker's graph of flow at each head. |
| Turnover | Flow per hour divided by the system's volume. |
| Volt (V) | The unit of electrical pressure; mains supply is given in volts. |
| Amp (A) | The unit of electrical current. |
| Watt (W) | The unit of power: volts x amps. |
| Watt-hour (Wh) | Energy: one watt for one hour; batteries are rated in it. |
| Kilowatt-hour (kWh) | 1000 watt-hours; the unit on an electricity bill. |
| Runtime | How long a battery can run the equipment plugged into it. |
1. Why the math matters
Doses, treatments, water changes, pumps and backup power all come from a few calculations. One wrong number makes every number after it wrong.
A dose is worked out from the water volume. A treatment is worked out from the water volume. A water change is a share of the water volume. If the volume is wrong, all of them are wrong, and an overdose or underdose of a supplement or medicine can harm or kill animals.
Most mistakes are simple: the wrong volume, the wrong unit, or a decimal point in the wrong place. This module works through the calculations used in daily care, with worked examples, and shows how to check each answer before anything goes into the water.
Write the working down. Write each calculation in the records with the numbers used, so it can be checked by someone else and repeated next time.
| If | Then |
|---|---|
| Volume | Every number starts here. |
| Units | Same unit throughout. |
| Working | Written down. |
Check your understanding
A coworker doses a treatment for a 400 L system using the tank's printed size. The system really holds 300 L. What happened?
The dose was a third too high, because it was worked out from the wrong volume. Every dose comes from the operating volume.
Key point Check before it goes in.
2. Units and conversions
Labels and test kits use different units. Convert everything to the same unit before calculating.
This course uses metric units: liters (L) and milliliters (mL) for volume, centimeters (cm) and millimeters (mm) for length, kilograms (kg) and grams (g) for weight, and degrees Celsius (C) for temperature. Many products and pumps are labeled in US units, so they have to be converted.
Volume. 1 L is 1000 mL. A US gallon is 231 cubic inches, which is 3.785 L. A label that says 1 mL per 25 US gallons means 1 mL per 94.6 L. Length. 1 inch is 2.54 cm, and 1 foot is 30.48 cm. Temperature. F = C x 9 / 5 + 32, so 26 C is 78.8 F.
Water test units. Salinity is in ppt (parts per thousand). Calcium, magnesium, nitrate and phosphate are in ppm (parts per million); in water, 1 ppm is about 1 mg/L. Alkalinity is in dKH or meq/L, and 1 meq/L is about 2.8 dKH (Module 6). Before comparing or calculating, check that both numbers are in the same unit.
Calculator: on the course website this is an interactive calculator.
| If | Then |
|---|---|
| 1 US gallon | 3.785 L. |
| 1 inch | 2.54 cm. |
| 1 meq/L | About 2.8 dKH. |
Check your understanding
A heater's box says it suits tanks up to 50 US gallons. The system's operating volume is 220 L. Is it within the rating?
No. 50 US gallons is 50 x 3.785 = 189 L, less than 220 L.
Key point Convert before calculating.
3. Tank and sump volume
A rectangular tank's volume is length x width x water height. In centimeters, divide by 1000 to get liters.
Measure the inside, and the water. Measure the inside length and width, and the height of the water itself, not the glass. The glass takes up space, and the water stops below the top.
Worked example. A display measures 118 cm long and 43 cm wide inside, with water 45 cm deep. 118 x 43 x 45 = 228,330 cubic centimeters. 1000 cubic centimeters is 1 L, so the display holds 228 L.
The sump is measured the same way, at its running water level, the level it sits at with the pumps on. A sump 80 cm long and 40 cm wide with water 25 cm deep while running holds 80 x 40 x 25 / 1000 = 80 L. Measure each section of the sump that holds water separately and add them.
Other shapes. For a cylinder, the volume is 3.14 x radius x radius x water height. For a bow-front or corner tank, use the maker's figure or a volume calculator, then correct it for water height.
Calculator: on the course website this is an interactive calculator.
| If | Then |
|---|---|
| Measure | Inside, water height. |
| cm | L x W x H / 1000 = liters. |
| Sump | At running level. |
Check your understanding
A tank is 90 cm long, 45 cm wide and 50 cm tall outside, with water 42 cm deep. Why not use 90 x 45 x 50?
That's the outside of the glass to the top. Measure the inside and the water height; the real volume is less.
Key point Not the glass height.
4. Operating volume
The operating volume is all the water in the running system: display plus sump plus pipes, minus what rock and sand take up.
Doses, treatments and water changes are all worked out from the operating volume (Module 36). The volume printed on a tank isn't it.
Add the water. The display, the sump at its running level, and any reactors, refugia or long pipe runs that hold water.
Subtract the rock and sand. Rock and sand push water out. Their volume can be measured: note how much the water level rises when they go in, and work out that volume the same way as the tank. Animals and equipment take a little space too.
Worked example. Display 228 L, plus sump 80 L, minus 30 L for rock and sand measured when they went in, gives an operating volume of 278 L. That's the number in the records, and it's updated when rock, sand or large animals are added or removed. The operating volume can also be checked by the salt method in Module 36.
Calculator: on the course website this is an interactive calculator.
| If | Then |
|---|---|
| Add | Display, sump, reactors. |
| Subtract | Rock and sand. |
| Use | For every dose. |
Check your understanding
The display holds 228 L and the sump 80 L at running level. Rock and sand took up 30 L. What's the operating volume?
228 + 80 - 30 = 278 L.
Key point Update it as things change.
5. Dilution and salinity
When water is added, the salt in it doesn't change; it's spread through more water. That one fact handles mixing, top-off and lowering salinity.
C1 x V1 = C2 x V2. The concentration times the volume before mixing equals the concentration times the volume after. Adding fresh water dilutes; nothing is added or lost.
Worked example. 20 L of salt water at 35 ppt has 5 L of purified fresh water added. 35 x 20 = C2 x 25, so C2 = 28 ppt. This is why fresh water is never used to top up a water change, and why salt water is never used to top off evaporation (Module 5).
Lowering salinity. To bring a system down, salt water is removed and replaced with fresh purified water. The amount to replace is the volume x (salinity now - target) / salinity now. A 300 L system at 37 ppt brought to 35 ppt: 300 x 2 / 37 = 16 L replaced with fresh water. Make a correction like this in small steps, testing between them, not all at once.
Raising salinity works the other way: replace some system water with new salt water mixed a little higher, in small steps, testing between them.
Calculator: on the course website this is an interactive calculator.
Calculator: on the course website this is an interactive calculator.
| If | Then |
|---|---|
| Rule | C1 x V1 = C2 x V2. |
| Lower | Replace V x (now - target) / now. |
| Steps | Small, testing between. |
Check your understanding
10 L of new salt water at 35 ppt is topped up with 2 L of fresh water. What's the salinity now?
35 x 10 / 12 = 29 ppt. Fresh water dilutes it.
Key point Salt doesn't evaporate.
6. Doses
Every dose comes from three numbers: the shortfall, the product's strength from the label, and the operating volume.
Supplements. Dose = shortfall / the rise one dose unit gives x volume / the label's reference volume. On a product where 1 mL raises 100 L by 0.1 dKH, a 300 L system short by 0.2 dKH a day needs 0.2 / 0.1 x 300 / 100 = 6 mL more a day (Module 19).
Treatments. Labels give a dose per volume, such as so many mL per 40 L. Divide the operating volume by the label's volume and multiply by the label's dose. For a 278 L system on a product dosed per 40 L, that's 278 / 40 = 6.95 label doses. Check the label's units carefully: per L, per 100 L, per US gallon.
Measure doses accurately. Use a syringe or measuring cup marked in mL, or a calibrated dosing pump (Module 19). Large doses are split through the day, as the label directs.
Big doses get a second check. Before any treatment or a large change to a dose, a second person checks the volume, the unit and the result.
Calculator: on the course website this is an interactive calculator.
Calculator: on the course website this is an interactive calculator.
| If | Then |
|---|---|
| Three numbers | Shortfall, strength, volume. |
| Labels | Check per L or per gallon. |
| Big doses | A second check. |
Check your understanding
A product raises 100 L by 0.1 dKH per mL. A 500 L system is short 0.3 dKH a day. How much more a day?
0.3 / 0.1 x 500 / 100 = 15 mL a day.
Key point Measure in mL.
7. Water change math
A water change replaces a share of the operating volume. After the change, the system is a mix of the old water and the new.
How much. The share is of the operating volume. A 10% change on a 278 L system is 27.8 L, or 28 L.
What it does to a number. After a change, the level is: old level x (1 - share) + new water's level x share. Nitrate at 20 ppm with a 10% change of nitrate-free water: 20 x 0.9 = 18 ppm. Two 10% changes: 20 x 0.9 x 0.9 = 16.2 ppm. One 20% change: 16 ppm. This is why a 10% change every week and a 20% change every other week give a similar result (Module 32).
Mismatched water moves the system. A system at 7.0 dKH given a 20% change of new water at 8.0 dKH ends at 7.0 x 0.8 + 8.0 x 0.2 = 7.2 dKH. The larger the change, the further the system moves toward the new water, which is why large changes use closely matched water.
A change dilutes; it doesn't remove a cause. If a number returns after a change, the source is still there (Module 32).
Calculator: on the course website this is an interactive calculator.
| If | Then |
|---|---|
| Share | Of the operating volume. |
| After | old x (1 - share) + new x share. |
| Mismatch | Moves the system. |
Check your understanding
Phosphate is 0.10 ppm. After a 25% change with phosphate-free water, what is it?
0.10 x 0.75 = 0.075 ppm.
Key point A change dilutes.
8. Pump head and turnover
Add up the head, read the real flow from the pump curve, then divide by the operating volume for turnover.
Add up the head with the rules of thumb in Module 12: each 1 ft (0.3 m) of rise adds 1 ft of head, each 90 degree elbow about 1 ft, each 45 degree elbow about 0.5 ft, and each 10 ft (3 m) of flat pipe about 1 ft. A return that lifts 1.5 m (5 ft), through four 90 degree elbows and 3 m of flat pipe, has about 5 + 4 + 1 = 10 ft, or 3 m, of head.
Read the curve. Find that head on the maker's pump curve and read the flow there. The flow on the box is measured at zero head, and the pump delivers less once it's plumbed (Module 12).
Turnover is flow per hour divided by the operating volume. If the curve gives 1800 L per hour at 3 m of head, on a 278 L system the return turns the water over 1800 / 278 = 6.5 times an hour. Turnover from all pumps together is compared with the targets in Module 13, and the flow sent up must never be more than the drain can carry back down.
Calculator: on the course website this is an interactive calculator.
| If | Then |
|---|---|
| Head | Rise, elbows, pipe. |
| Curve | Real flow at that head. |
| Turnover | Flow / volume. |
Check your understanding
A pump's box says 3000 L per hour. Why not use that for turnover?
That's at zero head. Read the flow at the system's real head on the pump curve.
Key point Not the box figure.
9. Power, current and runtime
Watts are volts times amps. Runtime is battery watt-hours divided by watts. Energy is watts times hours.
Current. Watts = volts x amps, so amps = watts / volts. A 40 W pump draws 0.4 A on 100 V mains, or 0.33 A on 120 V. A 300 W heater draws 3 A on 100 V. Add the amps of everything on one circuit and keep the total within the circuit's rating; if it's close, ask an electrician (Module 2).
Runtime. Runtime in hours = the battery's capacity in watt-hours (Wh) / the watts plugged in. A 1,024 Wh power station running a 40 W return pump and a 20 W flow pump: 1024 / 60 = 17 hours before losses (Module 33). Some energy is lost in the conversion, so the real runtime is shorter; use the maker's figures.
Energy over time. Energy in watt-hours = watts x hours. 60 W for 3 days (72 hours) is 4,320 Wh, more than four full charges of that station, which is why the 3-day plan includes recharging it from the generator (Module 33). Divide watt-hours by 1000 for kilowatt-hours (kWh), the unit on the electricity bill.
Calculator: on the course website this is an interactive calculator.
| If | Then |
|---|---|
| Amps | Watts / volts. |
| Runtime | Wh / W, less losses. |
| Energy | W x hours. |
Check your understanding
A 1,024 Wh station runs 80 W of pumps. How long before losses?
1024 / 80 = 12.8 hours, less in reality because of losses.
Key point Stay within the circuit.
10. Weight, and checking every answer
Water weighs about 1 kg per liter, and salt water a little more. Before any answer is used, estimate it, check the units and the decimal point, and have big ones checked.
Weight. Fresh water weighs about 1 kg per liter; seawater weighs about 1.025 kg per liter. 278 L of salt water weighs about 285 kg, before the glass, rock, sand, sump, stand and equipment. The floor carries all of it (Module 10).
Estimate first. Before calculating, decide roughly what the answer should be. A 300 L system is a bit more than three 100 L lots, so a dose given per 100 L should be a bit more than three times the label amount. An answer far from the estimate is checked before it's used.
Check the units and the decimal point. mL and L, ppm and ppt, dKH and meq/L, liters and US gallons. A number ten times too big or too small is the classic mistake.
A second person checks treatments, large doses and anything that's hard to undo. When an animal's life depends on a number, two people agree on it before it goes into the water.
Calculator: on the course website this is an interactive calculator.
Calculation drill: on the course website this is an interactive drill. A worksheet led to a problem in the system; check each line and correct every mistake.
| If | Then |
|---|---|
| Weight | About 1 kg per liter. |
| Estimate | Before calculating. |
| Second person | For big doses. |
Check your understanding
A dose for a 200 L system comes out as 120 mL when the label says 2 mL per 100 L. What do you do?
Stop. The estimate is about 4 mL; 120 mL is far off, so check the units and the decimal point before anything goes in.
Key point Ten times out is a red flag.
11. Formulas
| Rectangular volume | L x W x water height (cm) / 1000 = liters |
| Operating volume | Display + sump + reactors - rock and sand |
| US gallons to liters | x 3.785 |
| Inches to cm | x 2.54 |
| meq/L to dKH | x 2.8 (about) |
| Dilution | C1 x V1 = C2 x V2 |
| Fresh water to lower salinity | V x (now - target) / now |
| Supplement dose | shortfall / rise per unit x V / label volume |
| After a water change | old x (1 - share) + new x share |
| Turnover | Flow at real head / operating volume |
| Amps | Watts / volts |
| Runtime | Wh / W, less losses |
| Energy | W x hours |
| Weight of salt water | About 1.025 kg per liter |
Module 35 test
30 questions. Pass with 27 or more. Opens after you pass every section check in this module. Sign in to start.
Sources
- NIST Handbook 133, Appendix E: the US gallon is 231 cubic inches
- Bulk Reef Supply: aquarium water volume calculator (real volume for dosing)
- Wikipedia: Seawater (average surface density about 1.025 kg/L)
- Red Sea Reef Foundation B: dose rate (That Pet Place listing)
- Anker SOLIX: aquarium battery backup during power outages
- Michael Maddox, President of IMARCS: husbandry practice and observations